The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Which of the following is taken into ...
➣ The best binder material to be used ...
➣ In a closed traverse : ...
➣ With increase in speed of the traffic ...
➣ If a vehicle travelling at 40 kmph ...
➣ Secular variation is important is important factor ...
➣ If in a Dorry abrasion test the ...
➣ As per IRG-recommendation, the average level of ...
➣ Length of summit curve for a stopping ...
➣ What is the mechanical widening required for ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Water Supply
➤ Strength of Material
➤ Transportation Engineering
➤ Hydrology
➤ Irrigation
➤ Concrete Structure