♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A 30m chain was found to be ...
➣ Clearance distance or set back distance required ...
➣ Gravity model is used in transportation planning ...
➣ In which of the following types of ...
➣ Length of a vehicle affects : ...
➣ The chain length which is not the ...
➣ A vehicle moving at 40 kmph speed ...
➣ Invar tapes are made of an alloy ...
➣ Chain surveying is used for : ...
➣ The optical square is based on the ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Building Material
➤ Soil Mechanics and Foundation
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Strength of Material
➤ Concrete Technology
➤ Water Supply