♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Positive error is caused if : ...
➣ Maximum allowable limit upto that a measurement ...
➣ What is the psychological widening of pavement ...
➣ Drive ways aire : ...
➣ An offset more than 15 m length ...
➣ Number of links in a 30 m ...
➣ In a prismatic compass : ...
➣ For accurate work,in comparison to chain, the ...
➣ In which of the following traffic signal ...
➣ The chain length which is not the ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Transportation Engineering
➤ Strength of Material
➤ Soil Mechanics and Foundation