♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Length of a vehicle affects : ...
➣ The effect of grade on safe overtaking ...
➣ A 30m chain was found to be ...
➣ In whole circle system, the bearing are ...
➣ The optical square is based on the ...
➣ The base line is measured with : ...
➣ Limiting length of offset depends upon : ...
➣ Obstacle to ranging but not chaining is ...
➣ Gravity model is used in transportation planning ...
➣ Negative errors are caused in chain, when ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Strength of Material
➤ Water Supply
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Steel Structure