♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Method of offset laying involving minimum measurement ...
➣ Limiting length of offset depends upon : ...
➣ With increase in speed of the traffic ...
➣ Open cross staff is used for setting ...
➣ If in a Dorry abrasion test the ...
➣ In a braking test, a vehicle travelling ...
➣ Invar tapes are made of an alloy ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Important points selected at the ends of ...
➣ If ruling gradients is 1 in 20 ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Transportation Engineering
➤ Concrete Technology
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Surveying
➤ Miscellaneous
➤ Solid Waste and Waste Water Treatment