♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Number of links in a 30 m ...
➣ Which of the following is taken into ...
➣ Obstacle to ranging but not chaining is ...
➣ The tie line is run throught the ...
➣ On a right angle road inter-section with ...
➣ In compass surtveying : ...
➣ The chain length which is not the ...
➣ On the right angled road inter-section with ...
➣ Maximum allowable limit upto that a measurement ...
➣ A 30m chain was found to be ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Surveying
➤ Steel Structure
➤ Concrete Technology
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Miscellaneous
➤ Strength of Material