♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Important points selected at the ends of ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Duirnal variation depends upon : ...
➣ In a braking test, a vehicle travelling ...
➣ Drive ways aire : ...
➣ Length of a vehicle affects : ...
➣ Dip of the needle : ...
➣ With increase in speed of the traffic ...
➣ Which of the following statement (s) is/are ...
➣ In soil stabilisation : ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Water Supply
➤ Hydrology
➤ Concrete Technology
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Concrete Structure