♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the off-tracking of a vehicle ...
➣ Length of transition curve for design speed ...
➣ Clearance distance or set back distance required ...
➣ In a closed traverse : ...
➣ For design, that length of transition curve ...
➣ Number of links in a 30 m ...
➣ With increase in speed of the traffic ...
➣ On a horizontal curve, if the pavement ...
➣ In a prismatic compass : ...
➣ Inclination of the needle to the horizontal ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Building Material
➤ Hydrology
➤ Irrigation
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Concrete Structure
➤ Water Supply