The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In compass surtveying : ...
➣ Permissible limits of error in chaining of ...
➣ A rotary will be more suitable than ...
➣ In whole circle system, the bearing are ...
➣ Length of a vehicle affects : ...
➣ The best binder material to be used ...
➣ With referance to the Marshall mix design ...
➣ The sag correction is always : ...
➣ Which of the following statement (s) is/are ...
➣ What is the mechanical widening required for ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Transportation Engineering
➤ Water Supply
➤ Strength of Material
➤ Steel Structure