The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The base line is measured with : ...
➣ Chain surveying is used for : ...
➣ When speed of traffic flow becomes zero, ...
➣ If average centre to centre spacing of ...
➣ Which of the following is taken into ...
➣ Number of links in a 30 m ...
➣ Gravity model is used in transportation planning ...
➣ Which of the following statement (s) is/are ...
➣ The main difference between optical square and ...
➣ In survey works declinations varies from time ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Hydrology
➤ Miscellaneous
➤ Surveying
➤ Strength of Material
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Concrete Structure