The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Important points selected at the ends of ...
➣ The optical square is based on the ...
➣ Limiting length of offset depends upon : ...
➣ For a constant value of co-efficient of ...
➣ An offset more than 15 m length ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Duirnal variation depends upon : ...
➣ The closing error in a traverse is ...
➣ Which of the following is taken into ...
➣ What is the off-tracking of a vehicle ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Strength of Material
➤ Building Material
➤ Steel Structure
➤ Concrete Structure
➤ Solid Waste and Waste Water Treatment
➤ Surveying
➤ Concrete Technology