The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The chain length which is not the ...
➣ Drive ways aire : ...
➣ Obstacle to ranging but not chaining is ...
➣ Limiting length of offset depends upon : ...
➣ Open cross staff is used for setting ...
➣ With increase in speed of the traffic ...
➣ The position of point can be fixed ...
➣ Shift of the transition curve of radius ...
➣ Secular variation is important is important factor ...
➣ Permissible limits of error in chaining of ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Hydrology
➤ Surveying
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Steel Structure
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics