The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Prismatic compass and surveyor's compass respectively given ...
➣ The base line is measured with : ...
➣ Which of the following statements is/are correct ...
➣ With regards to traversing : ...
➣ For detecting whether a bitumen is cracked ...
➣ With increase in speed of the traffic ...
➣ A building is an obstacles to : ...
➣ If in a Dorry abrasion test the ...
➣ Normal tension is that pull which : ...
➣ In which of the following types of ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Solid Waste and Waste Water Treatment
➤ Irrigation
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Steel Structure
➤ Building Material
➤ Concrete Technology