Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Length of a vehicle affects : ...
➣ The tie line is run throught the ...
➣ For design, that length of transition curve ...
➣ With referance to the Marshall mix design ...
➣ Obstacle to ranging but not chaining is ...
➣ Which of the following statement (s) is/are ...
➣ If ruling gradients is 1 in 20 ...
➣ Drive ways aire : ...
➣ Limiting length of offset depends upon : ...
➣ If a vehicle travelling at 40 kmph ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Hydrology
➤ Steel Structure
➤ Miscellaneous
➤ Water Supply
➤ Strength of Material
➤ Irrigation