The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Open cross staff is used for setting ...
➣ Metallic tapes are made of : ...
➣ Method of offset laying involving minimum measurement ...
➣ Number of links in a 30 m ...
➣ Negative errors are caused in chain, when ...
➣ The base line is measured with : ...
➣ On a right angle road inter-section with ...
➣ Compensating errors in chaining are : ...
➣ When speed of traffic flow becomes zero, ...
➣ Obstacle to ranging but not chaining is ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Water Supply