The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ Which of the following is taken into ...
➣ In desire line diagram : ...
➣ Gravity model is used in transportation planning ...
➣ Errors which remain after mistakes and systematic ...
➣ Shift of the transition curve of radius ...
➣ Obstacle to ranging but not chaining is ...
➣ Length of a vehicle affects : ...
➣ If ruling gradients is 1 in 20 ...
➣ Negative errors are caused in chain, when ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Hydrology
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Surveying
➤ Fluid Mechanics and Hydraulics
➤ Building Material