The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ An offset more than 15 m length ...
➣ A 30m chain was found to be ...
➣ Length of a vehicle affects : ...
➣ Most probable value of an observed quantity ...
➣ A rotary will be more suitable than ...
➣ Method of offset laying involving minimum measurement ...
➣ With increase in speed of the traffic ...
➣ If ruling gradients is 1 in 20 ...
➣ Inclination of the needle to the horizontal ...
➣ In which of the following traffic signal ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)