♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A vehicle moving at 40 kmph speed ...
➣ Length of a vehicle affects : ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ In whole circle system, the bearing are ...
➣ On a horizontal curve, if the pavement ...
➣ Which of the following statements is/are correct ...
➣ The optical square is based on the ...
➣ Metallic tapes are made of : ...
➣ In which of the following traffic signal ...
➣ For design, that length of transition curve ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Water Supply
➤ Miscellaneous
➤ Concrete Structure
➤ Strength of Material
➤ Building Material
➤ Concrete Technology
➤ Hydrology