♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Which of the following statement (s) is/are ...
➣ The chain length which is not the ...
➣ Dip of the needle : ...
➣ On the right angled road inter-section with ...
➣ In a closed traverse : ...
➣ For a constant value of co-efficient of ...
➣ For accurate work,in comparison to chain, the ...
➣ With referance to the Marshall mix design ...
➣ Most probable value of an observed quantity ...
➣ In survey works declinations varies from time ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Concrete Technology
➤ Water Supply