The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Positive error is caused if : ...
➣ In whole circle system, the bearing are ...
➣ With regards to traversing : ...
➣ In a closed traverse : ...
➣ When speed of traffic flow becomes zero, ...
➣ In which of the following types of ...
➣ Method of offset laying involving minimum measurement ...
➣ Which of the following statements is/are correct ...
➣ A river is an obstacle to : ...
➣ A rotary will be more suitable than ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Irrigation
➤ Miscellaneous
➤ Building Material
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation