Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Normal tension is that pull which : ...
➣ The position of point can be fixed ...
➣ Important points selected at the ends of ...
➣ If free mean speed on a roadway ...
➣ The best binder material to be used ...
➣ Invar tapes are made of an alloy ...
➣ In compass surtveying : ...
➣ Duirnal variation depends upon : ...
➣ If a vehicle travelling at 40 kmph ...
➣ During chaining along straight line,the leader of ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Hydrology
➤ Solid Waste and Waste Water Treatment
➤ Concrete Structure
➤ Surveying
➤ Building Material
➤ Pollution (Air and Noise)
➤ Steel Structure