The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Chain surveying is used for : ...
➣ A building is an obstacles to : ...
➣ For design, that length of transition curve ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ The closing error in a traverse is ...
➣ A vehicle moving at 40 kmph speed ...
➣ Permissible limits of error in chaining of ...
➣ Limiting length of offset depends upon : ...
➣ The tie line is run throught the ...
➣ What is the off-tracking of a vehicle ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Surveying
➤ Building Material
➤ Concrete Structure