The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If a vehicle travelling at 40 kmph ...
➣ An offset more than 15 m length ...
➣ In which of the following traffic signal ...
➣ On the right angled road inter-section with ...
➣ Gravity model is used in transportation planning ...
➣ In a closed traverse : ...
➣ Which of the following statement (s) is/are ...
➣ The optical square is based on the ...
➣ Length of summit curve for a stopping ...
➣ In survey works declinations varies from time ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Irrigation
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Concrete Structure
➤ Steel Structure
➤ Surveying
➤ Pollution (Air and Noise)