The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Dip of the needle : ...
➣ The effect of grade on safe overtaking ...
➣ Gravity model is used in transportation planning ...
➣ Obstacle to ranging but not chaining is ...
➣ Length of summit curve for a stopping ...
➣ Normal tension is that pull which : ...
➣ A negative declination shows the magnetic meridian ...
➣ If free mean speed on a roadway ...
➣ Length of a vehicle affects : ...
➣ In a braking test, a vehicle travelling ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Hydrology
➤ Concrete Structure
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Building Material