The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Permissible limits of error in chaining of ...
➣ Duirnal variation depends upon : ...
➣ The base line is measured with : ...
➣ Clearance distance or set back distance required ...
➣ In desire line diagram : ...
➣ A building is an obstacles to : ...
➣ Gravity model is used in transportation planning ...
➣ For detecting whether a bitumen is cracked ...
➣ Shift of the transition curve of radius ...
➣ Method of offset laying involving minimum measurement ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Pollution (Air and Noise)
➤ Steel Structure
➤ Irrigation
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Transportation Engineering