The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ As per IRG-recommendation, the average level of ...
➣ Method of offset laying involving minimum measurement ...
➣ Positive error is caused if : ...
➣ Quadrantal system confines the user to measure ...
➣ In which of the following traffic signal ...
➣ Invar tapes are made of an alloy ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ In survey works declinations varies from time ...
➣ Inclination of the needle to the horizontal ...
➣ With increase in speed of the traffic ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment
➤ Irrigation
➤ Fluid Mechanics and Hydraulics
➤ Hydrology
➤ Surveying