The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On a right angled road inter-section with ...
➣ A field is measured with a 1.0 ...
➣ Maximum allowable limit upto that a measurement ...
➣ If in a Dorry abrasion test the ...
➣ What is the mechanical widening required for ...
➣ Compensating errors in chaining are : ...
➣ The main difference between optical square and ...
➣ During chaining along straight line,the leader of ...
➣ While aligning a hill road with a ...
➣ Prismatic compass and surveyor's compass respectively given ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Miscellaneous
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Steel Structure
➤ Surveying
➤ Fluid Mechanics and Hydraulics