Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ During chaining along straight line,the leader of ...
➣ In soil stabilisation : ...
➣ For detecting whether a bitumen is cracked ...
➣ If free mean speed on a roadway ...
➣ What is the off-tracking of a vehicle ...
➣ For accurate work,in comparison to chain, the ...
➣ If average centre to centre spacing of ...
➣ Method of offset laying involving minimum measurement ...
➣ Gravity model is used in transportation planning ...
➣ Chainage is the distance measured : ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Concrete Technology
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Surveying
➤ Miscellaneous
➤ Solid Waste and Waste Water Treatment
➤ Strength of Material