The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Normal tension is that pull which : ...
➣ Which of the following is taken into ...
➣ A negative declination shows the magnetic meridian ...
➣ On a horizontal curve, if the pavement ...
➣ While aligning a hill road with a ...
➣ On the right angled road inter-section with ...
➣ Limiting length of offset depends upon : ...
➣ Positive error is caused if : ...
➣ Duirnal variation depends upon : ...
➣ Quadrantal system confines the user to measure ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Transportation Engineering
➤ Hydrology
➤ Building Material
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Irrigation