The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Important points selected at the ends of ...
➣ Number of links in a 30 m ...
➣ With increase in speed of the traffic ...
➣ The chain length which is not the ...
➣ If in a Dorry abrasion test the ...
➣ A 30m chain was found to be ...
➣ Most probable value of an observed quantity ...
➣ A building is an obstacles to : ...
➣ Maximum allowable limit upto that a measurement ...
➣ Errors which remain after mistakes and systematic ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Irrigation
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Steel Structure
➤ Water Supply