The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The closing error in a traverse is ...
➣ Length of transition curve for design speed ...
➣ The chain length which is not the ...
➣ A 30m chain was found to be ...
➣ During chaining along straight line,the leader of ...
➣ Positive error is caused if : ...
➣ In desire line diagram : ...
➣ Metallic tapes are made of : ...
➣ Which of the following statements is/are correct ...
➣ Normal tension is that pull which : ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Strength of Material
➤ Irrigation
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology