Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Obstacle to ranging but not chaining is ...
➣ Which of the following is taken into ...
➣ The base line is measured with : ...
➣ Important points selected at the ends of ...
➣ In which of the following types of ...
➣ The position of point can be fixed ...
➣ Chainage is the distance measured : ...
➣ Secular variation is important is important factor ...
➣ Length of summit curve for a stopping ...
➣ For accurate work,in comparison to chain, the ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Surveying
➤ Hydrology
➤ Water Supply
➤ Strength of Material
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation