♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Bitumen grade 80/100 indicates that under the ...
➣ The sag correction is always : ...
➣ Shift of the transition curve of radius ...
➣ The chain length which is not the ...
➣ What is the psychological widening of pavement ...
➣ What is the mechanical widening required for ...
➣ In a braking test, a vehicle travelling ...
➣ 30th highest hour volumes is : ...
➣ If a vehicle travelling at 40 kmph ...
➣ Duirnal variation depends upon : ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Building Material
➤ Miscellaneous
➤ Strength of Material
➤ Steel Structure