♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Shift of the transition curve of radius ...
➣ If a vehicle travelling at 40 kmph ...
➣ A rotary will be more suitable than ...
➣ The base line is measured with : ...
➣ What is the mechanical widening required for ...
➣ Limiting length of offset depends upon : ...
➣ With referance to the Marshall mix design ...
➣ In which of the following traffic signal ...
➣ A 30m chain was found to be ...
➣ A field is measured with a 1.0 ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Miscellaneous