The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For accurate work,in comparison to chain, the ...
➣ Errors which remain after mistakes and systematic ...
➣ Chainage is the distance measured : ...
➣ A 30m chain was found to be ...
➣ In soil stabilisation : ...
➣ In whole circle system, the bearing are ...
➣ The base line is measured with : ...
➣ Metallic tapes are made of : ...
➣ Maximum allowable limit upto that a measurement ...
➣ Limiting length of offset depends upon : ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Hydrology
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Steel Structure
➤ Transportation Engineering
➤ Concrete Technology
➤ Miscellaneous