♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A building is an obstacles to : ...
➣ On a right angled road inter-section with ...
➣ Metallic tapes are made of : ...
➣ If free mean speed on a roadway ...
➣ With increase in speed of the traffic ...
➣ If in a Dorry abrasion test the ...
➣ Length of summit curve for a stopping ...
➣ While aligning a hill road with a ...
➣ Which of the following statements is/are correct ...
➣ A vehicle moving at 40 kmph speed ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Concrete Structure
➤ Surveying
➤ Miscellaneous
➤ Concrete Technology
➤ Hydrology