The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On a right angle road inter-section with ...
➣ For a constant value of co-efficient of ...
➣ The position of point can be fixed ...
➣ Drive ways aire : ...
➣ Metallic tapes are made of : ...
➣ If ruling gradients is 1 in 20 ...
➣ In whole circle system, the bearing are ...
➣ Obstacle to ranging but not chaining is ...
➣ If in a Dorry abrasion test the ...
➣ A rotary will be more suitable than ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Surveying
➤ Miscellaneous
➤ Water Supply
➤ Hydrology
➤ Concrete Technology
➤ Building Material
➤ Fluid Mechanics and Hydraulics