Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With increase in speed of the traffic ...
➣ The sag correction is always : ...
➣ The chain length which is not the ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ In a prismatic compass : ...
➣ The tie line is run throught the ...
➣ Metallic tapes are made of : ...
➣ Obstacle to ranging but not chaining is ...
➣ As per IRG-recommendation, the average level of ...
➣ Normal tension is that pull which : ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Miscellaneous
➤ Surveying
➤ Steel Structure
➤ Hydrology
➤ Strength of Material
➤ Soil Mechanics and Foundation
➤ Building Material