♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The chain length which is not the ...
➣ With regards to traversing : ...
➣ Duirnal variation depends upon : ...
➣ The optical square is based on the ...
➣ As per IRG-recommendation, the average level of ...
➣ A 30m chain was found to be ...
➣ The base line is measured with : ...
➣ Metallic tapes are made of : ...
➣ For a constant value of co-efficient of ...
➣ During chaining along straight line,the leader of ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Steel Structure
➤ Irrigation
➤ Concrete Structure