♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Maximum allowable limit upto that a measurement ...
➣ In a braking test, a vehicle travelling ...
➣ What is the mechanical widening required for ...
➣ The effect of grade on safe overtaking ...
➣ Which of the following statement (s) is/are ...
➣ On a horizontal curve, if the pavement ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ Metallic tapes are made of : ...
➣ If free mean speed on a roadway ...
➣ A rotary will be more suitable than ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Concrete Technology
➤ Concrete Structure
➤ Hydrology