♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :2.0K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In survey works declinations varies from time ...
➣ The sag correction is always : ...
➣ With referance to the Marshall mix design ...
➣ Length of summit curve for a stopping ...
➣ Method of offset laying involving minimum measurement ...
➣ Positive error is caused if : ...
➣ Gravity model is used in transportation planning ...
➣ Which of the following statements is/are correct ...
➣ In which of the following traffic signal ...
➣ A river is an obstacle to : ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Hydrology
➤ Fluid Mechanics and Hydraulics
➤ Surveying
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous