♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Solid Waste and Waste Water Treatment
The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Which of the following pairs is not ...
➣ In which treatment unit is "Schmutz decke" ...
➣ Are requirements (ha) for disposal of the ...
➣ The minimum dissolved oxygen which should always ...
➣ Total volatile suspended solids to be anaerobically ...
➣ In which type of lakes, does a ...
➣ Critical factors for the activated sludge treatment ...
➣ Sewage sickness relates to : ...
➣ The least expensive and most suitable excreta ...
➣ Which one the following chemicals is employed ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Concrete Technology
➤ Water Supply
➤ Steel Structure
➤ Irrigation
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics