Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ As per IRG-recommendation, the average level of ...
➣ Permissible limits of error in chaining of ...
➣ For detecting whether a bitumen is cracked ...
➣ The position of point can be fixed ...
➣ The base line is measured with : ...
➣ Important points selected at the ends of ...
➣ A river is an obstacle to : ...
➣ On a horizontal curve, if the pavement ...
➣ Dip of the needle : ...
➣ The sag correction is always : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Concrete Structure
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Strength of Material
➤ Transportation Engineering