♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Which of the following statement (s) is/are ...
➣ In which of the following types of ...
➣ A river is an obstacle to : ...
➣ With regards to traversing : ...
➣ Which of the following is taken into ...
➣ For a constant value of co-efficient of ...
➣ Maximum allowable limit upto that a measurement ...
➣ For accurate work,in comparison to chain, the ...
➣ What is the psychological widening of pavement ...
➣ The tie line is run throught the ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Soil Mechanics and Foundation
➤ Water Supply
➤ Transportation Engineering
➤ Irrigation
➤ Pollution (Air and Noise)
➤ Surveying
➤ Concrete Structure