Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Positive error is caused if : ...
➣ In a prismatic compass : ...
➣ Shift of the transition curve of radius ...
➣ A vehicle moving at 40 kmph speed ...
➣ Open cross staff is used for setting ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ The best binder material to be used ...
➣ Inclination of the needle to the horizontal ...
➣ A building is an obstacles to : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Irrigation
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics
➤ Steel Structure
➤ Transportation Engineering
➤ Miscellaneous
➤ Soil Mechanics and Foundation