The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Permissible limits of error in chaining of ...
➣ Important points selected at the ends of ...
➣ For a constant value of co-efficient of ...
➣ Most probable value of an observed quantity ...
➣ In a braking test, a vehicle travelling ...
➣ As per IRG-recommendation, the average level of ...
➣ If in a Dorry abrasion test the ...
➣ The entrance and exit curves of a ...
➣ Shift of the transition curve of radius ...
➣ Prismatic compass and surveyor's compass respectively given ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Building Material
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Transportation Engineering
➤ Surveying
➤ Irrigation