The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In a prismatic compass : ...
➣ A river is an obstacle to : ...
➣ In which of the following types of ...
➣ A building is an obstacles to : ...
➣ Length of summit curve for a stopping ...
➣ If in a Dorry abrasion test the ...
➣ For detecting whether a bitumen is cracked ...
➣ Number of links in a 30 m ...
➣ Clearance distance or set back distance required ...
➣ An offset more than 15 m length ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Transportation Engineering
➤ Water Supply
➤ Concrete Structure