♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Length of summit curve for a stopping ...
➣ If average centre to centre spacing of ...
➣ Negative errors are caused in chain, when ...
➣ If a vehicle travelling at 40 kmph ...
➣ Which of the following statement (s) is/are ...
➣ Normal tension is that pull which : ...
➣ In desire line diagram : ...
➣ Open cross staff is used for setting ...
➣ On a horizontal curve, if the pavement ...
➣ While aligning a hill road with a ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Surveying
➤ Concrete Structure
➤ Water Supply
➤ Concrete Technology
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Strength of Material