♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A negative declination shows the magnetic meridian ...
➣ During chaining along straight line,the leader of ...
➣ If free mean speed on a roadway ...
➣ Inclination of the needle to the horizontal ...
➣ The base line is measured with : ...
➣ The chain length which is not the ...
➣ Which of the following statement (s) is/are ...
➣ True meridians : ...
➣ For design, that length of transition curve ...
➣ In whole circle system, the bearing are ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Surveying
➤ Hydrology
➤ Concrete Technology
➤ Irrigation
➤ Transportation Engineering
➤ Building Material
➤ Pollution (Air and Noise)