The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Open cross staff is used for setting ...
➣ For a constant value of co-efficient of ...
➣ Obstacle to ranging but not chaining is ...
➣ Drive ways aire : ...
➣ If ruling gradients is 1 in 20 ...
➣ On the right angled road inter-section with ...
➣ In soil stabilisation : ...
➣ Important points selected at the ends of ...
➣ Compensating errors in chaining are : ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Hydrology
➤ Miscellaneous
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Surveying
➤ Building Material
➤ Strength of Material